The work gets compressed
The same meetings, reports and approvals in fewer hours. Strain rises, and the trial quietly ends.
Most four-day weeks go wrong in the same way. The day goes, the work stays, and five days of pressure get squeezed into four.
The working week
Four days of work. One day returned.
We change the work first. Through our method, MERA (Map, Eliminate, Redesign, Automate), we find the hours that add nothing, remove them, rebuild what remains and automate the routine load. Then we measure the gain against a baseline and return it as a day a week, at full pay.
A shorter week works when there is less work to fit into it. That is the part we build.
The same meetings, reports and approvals in fewer hours. Strain rises, and the trial quietly ends.
Emails and calls spill into the day off, so nobody really gets it back.
Response times slip because cover was never planned.
The Map comes first, because you cannot remove hours you have not measured. Why process mapping is the first step.
We see how the work actually runs and record the baseline: output, service, quality, errors, rework and hours.
We stop the reports, meetings and approvals that do not change an outcome.
We rebuild hand-offs, decisions, roles and cover so the work fits in four days.
We build the systems and AI agents that take on the routine load, once the process and data are ready.
One day a week back, at full pay, measured against the baseline.
We set the baseline before the working week changes, and agree in advance what success means. For example: output and service stay within an agreed range, quality holds, and overtime does not rise.
The same measures are tracked during and after the change, so the decision rests on evidence, not opinion. If one team is ready and another is not, you see exactly where the work still needs to change.
For the detail, read how to measure whether a four-day-week trial works.

I first did this in 2008, at our family publishing house in Athens. We rebuilt the operating model with the method I now call MERA, and shorter hours came with pay untouched. Years later, running operations at a digital production agency in London, the same approach gave evenings and weekends back to the team while the agency scaled up.
At Maximum4, we work a four-day week ourselves.
Emmanuel Linardatos, founder
−75%
Department costs
8 → 30
Orders fulfilled per day
+40%
Revenue in a year
6 hours
Returned per person weekly
Operations transformation using MERA. Two years, measured against the baseline before the change.
The largest UK trial was run in 2022 by Autonomy with 4 Day Week Global. These results show a shorter week can work in very different organisations. They do not promise it will work in yours without changing how the work is done.
61
Organisations in the 2022 UK trial, with around 2,900 workers
56
Continued with the four-day week after the trial
54
Still running it a year later, 31 of them permanently
Sources: Autonomy, The results are in (2023) and Autonomy, Making it stick (2024).
Admin, cases, projects, client service and recurring reporting.
Not only the rota.
And returned time would change retention, hiring or service.
Not ready for a four-day week?
The same method can return the gain as capacity instead: more output from the same team, measured the same way. You can move to a shorter week later.
Not with us. The aim is a four-day week at full pay, funded by the gain from redesigning the work. If the measured gain is not yet enough, the returned time can start as a shorter week or added capacity while the work keeps changing.
Cover is designed in the Redesign stage, before hours change. Depending on your client commitments, that might mean staggered days off, rota cover or clear response standards.
They are part of the design from the start. We agree how the change applies to them, such as a proportional reduction in hours, before anything starts, so no role is treated unfairly.
The Map takes 2 to 4 weeks and is priced from £2,500, with the price agreed before work starts. How long it takes to reach the returned day depends on how much needs to change, and the Map gives you that estimate.
The thresholds are agreed before the change begins. Mixed results show where the work still needs redesign. They do not mean the whole idea has failed, and the measured gain can still return as capacity.
In 2 to 4 weeks, the Map shows how your work runs, where the hours go and how much time a redesign could return. Fixed price, from £2,500.
Start with the MapBring one process, one department or the whole company. The Map is a paid, fixed-price engagement, with scope setting both the length and the price.